Durham Region Transit
Long Term Transit Strategy
In 2010 Durham Region Transit (DRT) completed a Long term Transit Strategy (LTTS) to identify existing transit demands and project the future needs of 2031 and beyond.
The Final Report and Appendices:
- Final Report (PDF 33MB)
- Appendix A - Background Reports (PDF 50MB)
- Appendix B - Specialized Transit (PDF 4MB)
- Appendix C - Alternative Transit Tech (PDF 6.5MB)
- Appendix D - RT Network Development Process (PDF 31MB)
- Appendix E - Implementation Plans (PDF 3MB)
- Appendix F - Capital & Operating Costs (PDF 3.4MB)
- Appendix G - Model Documentation (PDF 50.5MB)
- Appendix H - Natural & Cultural (PDF 14MB)
- Appendix J - Rec Service Standards (PDF 4.6MB)
- Appendix K - ITS Strategy (PDF 7.6MB)
- Appendix L - TDM Strategy (PDF 3.6MB)
- Appendix M - Goods Movement (PDF 8.6MB)
- Appendix N - TOD Strategy (PDF 39MB)
- Appendix O - 39 TOD Places & T St Guidelines (PDF 52MB)
- Appendix P - CostBen Econ Analysis (PDF 3MB)
- Appendix Q - Pinch Point Concepts (PDF 205MB)
- Appendix R - Microsimulation (PDF 5.5MB)
- Appendix S - HWY 2 Concepts (PDF 263.6MB)
- Appendix T - Sheppard Hub (PDF 14.8MB)
- Appendix U - HWY 2 Cost Est Assumptions (PDF 3MB)
- Appendix V - HWY 2 Phase 1 (PDF 81.3MB)
- Appendix W - Consultation (PDF 93.2MB)












